Lot 1225 Bay View DrDesign ref. 70969MK2,601 SF$361K$728K$367K
Lot 21 Lanyard Circle #35Design ref. 59347ND2,755 SF$420K$887K$467K
Lot 323 Tradewinds WayDesign ref. 95125RW2,346 SF$345K$615K$270K
TotalThree lots7,702 SF$1.126M$2.230M$1.104M
Estimated costProjected sale
These figures are presented as preliminary gross economics and should be reconciled against final soft costs, financing, closing costs, sales commissions, and ARV support.
05 — Why Request $2M?Strategic reserve
The remaining capacity is strategic capital, not unused money.
$2.0MTotal requested capacity
$1.126MInitial identified use
$874KStrategic reserve
56.3% initial utilization43.7% reserve
$0$1.126M$2.0M
Replacement lots if a target property becomes unavailable.
Higher-quality acquisitions if better opportunities appear.
Construction flexibility and contingency protection.
Faster closings without restarting the capital approval process.
06 — Use of FundsExecution certainty
Capital supports acquisition, construction, and execution certainty.
Land acquisitions and closing costs
Architectural plans, design, permits, HOA approvals, and utility tap fees
Site preparation, foundation, framing, rough-ins, finishes, appliances, and landscaping
Construction contingency, replacement opportunities, and financing costs
Strategic liquidity to protect schedule and lender collateral
07 — Acquisition CriteriaTen checks
Each lot must support the purchase, build, and exit plan.
01ARV support
02Purchase price
03Build cost
04HOA / CARE
05Utilities
06Title
07Back dues
08Site conditions
09Resale demand
10Margin
The standard is simple: the deal must make sense before capital moves.
08 — Deal Classification SystemThe screen
Discipline is shown by rejecting weak opportunities.
Green
Proceed
Meets return, title, site, and market standards.
Green-Yellow
Viable with confirmation
Attractive, but needs ARV, HOA, cost, or due diligence confirmation.
Yellow
Negotiate or monitor
Potential only if terms improve or assumptions strengthen.
Red
Reject
Does not protect capital or meet the model.
Capital is not approved because a lot is available. Capital is approved because the opportunity passes the screen.
09 — Project ExamplesSalem, SC 29676
Three lots, each underwritten on its own evidence.
GL + WCGeneral liability and workers' comp reported
Positioned as a strategic construction and business advisory resource, not as the licensed builder or general contractor.
Supports G5 ELEVATE through business acceleration, construction education, credit awareness, investor communication, and development discipline.
Background combines economics, entrepreneurial execution, construction education, and practical field-facing business knowledge.
Final role, insurance certificates, references, advisory scope, and written agreement should be verified before formal lender reliance.
19 — The Ask: Capital RequestMost efficient structure
G5 ELEVATE is seeking the most efficient capital structure available.
$2,000,000 acquisition and construction financing request
$2,000,000
Acquisition and construction financing request
Structure A: revolving line of credit up to $2,000,000.
Structure B: one full $2,000,000 loan funded up front.
Maximum requested term: 24 months.
Primary objective: secure the lowest possible rate while meeting lender requirements.
Use: qualified residential acquisition, construction, reserves, and project execution.
20 — A closing principle for lender alignment
Count the cost before building.
G5 ELEVATE intends to grow through opportunity, speed, and discipline. The capital request is designed to support fast acquisitions without abandoning prudent underwriting, truthful numbers, and lender protection.
Prudence and truth protect the sponsor, the lender, and the name behind the work.
Luke 14:28For which of you, desiring to build a tower, does not first sit down and count the cost?